The purpose of this work is the calculation of the optimal parameters involved with advanced drilling of gas-draining holes. These holes are made to floor entryways and provide an efficiency test for floor degas extractions, like the AB bed at the Uralkali’s Berizniki Ore Development Unit No 2 and Unit No 4 (Mine 2 and Mine 4). Current conditi...
View ArticleAlthough the dynamic load test technique has been developed for a long time, it became very popular in Brazil over the last 20 years (especially after the publication of Brazilian Standard NBR6122, in 2010). However, the site quality control of driven piles in respect to the resistant capacities remains with the practical application of the so-called &a...
View Article
Recent Articles